→F-1004C-L and F1004C-R
+144
→F-1004C-L and F1004C-R
+5
→F-1004C-L and F1004C-R
+1
Created page with "==PAGE 25-1== ==PAGE 25-2== ==PAGE 25-3== === F-1004C-L and F1004C-R === Step 8 details the assembly of the bulkheads to the center section prior to deburring and priming these parts. Now is a very good time to consider whether you will need additional pass-through holes in the bulkheads for items like conduit, pitot, static, and AoA sensor tubing, air conditioning lines, and other electrical circuits. Many builders find that the two holes referenced here and on PAGE..."
+1,408