SECTION 25: MID FUSE BULKHEADS: Difference between revisions

m
Line 22: Line 22:
==PAGE 25-4==
==PAGE 25-4==
* Step 6<br> Step 6 requires you to 'Rivet the Mid Seat Rail Support Subassemblies, F-1004C-L and -R Center Section Bulkheads and F-1004N Stiffener Angles to the F-1004A Center Section Bulkhead per the callouts in Figure 2.' Figure 2 in the plans (Rev 1 Date 1/7/21) omits the quantity and rivets to be used. The older plans (Rev 0 Date 7/24/14) shows the rivets and places.
* Step 6<br> Step 6 requires you to 'Rivet the Mid Seat Rail Support Subassemblies, F-1004C-L and -R Center Section Bulkheads and F-1004N Stiffener Angles to the F-1004A Center Section Bulkhead per the callouts in Figure 2.' Figure 2 in the plans (Rev 1 Date 1/7/21) omits the quantity and rivets to be used. The older plans (Rev 0 Date 7/24/14) shows the rivets and places.
* Step 7<br>Don't insert the snap bushings instead widen the two holes to a bit larger than .75 inches (but below .82) so they can pass through Van's conduit later. Also drill a third hole with same diameter underneath the two holes for a third conduit.
* Step 7<br>Don't insert the snap bushings instead widen the two holes to a bit larger than .75 inches (.77) so they can pass through Van's conduit later. Also drill a third / forth hole with same diameter underneath the two holes for a more conduits if desired.


==PAGE 25-5==
==PAGE 25-5==