RV10 Community Wiki: Difference between revisions

m
(Added notes about large lead-time items)
Line 151: Line 151:
** Exterior Paint (some shops have several years lead-time)
** Exterior Paint (some shops have several years lead-time)
** Avionics/Wiring (only if you want to outsource the design and wiring)
** Avionics/Wiring (only if you want to outsource the design and wiring)
* If you get stuck waiting on something, consider some of the suggestions in [[What to do when stuck]]


{| class="wikitable" style="margin:left"
{| class="wikitable" style="margin:left"
Line 371: Line 372:
* [[Windows]]
* [[Windows]]
* [[Wing Tips]]
* [[Wing Tips]]
See also Reanaissance Sean's excel sheet with costs (from April 2022): [[index.php?title=Media:RV-10 Kit cost.xlsx|RV-10 Kit cost.xlsx]]
See also Reanaissance Sean's excel sheet with costs (from April 2022): [[Index.php?title=Media:RV-10 Kit cost.xlsx|RV-10 Kit cost.xlsx]]


==Builder Logs ==
==Builder Logs ==
186

edits

MediaWiki spam blocked by CleanTalk.