SECTION FF2: COWL BAFFLE
Jump to navigation
Jump to search
Build Instruction Updates
- N/A
Check for more recent updates here
Hints
Page FF2-10
- Step 4: The CB-1002C / CB-1010C air dams are too large as shipped. You will probably get two hot front cylinders if left at the original size. Several builders report that they never even installed them and that this was the correct call. See also:
Page FF2-11
- Step 5: See FF2-10 Step 4.
Page FF2-17
- Step 1: Consider adding the anti chafing plastic tubing (0.062 X 1/4) BEFORE bending or threading. It is VERY difficult to push the tubing over the bends and threads even when warmed up.