3
edits
m (→Page 8-3) |
No edit summary |
||
Line 11: | Line 11: | ||
==== Page 8-2 ==== | ==== Page 8-2 ==== | ||
* Step 5: The manufactured head of the rivets attaching the doubler to the rear spar go onto the spar side to reduce the likelihood of interference with the elevator leading edge. | * Step 5: The manufactured head of the rivets attaching the doubler to the rear spar go onto the spar side to reduce the likelihood of interference with the elevator leading edge. This orientation is consistent with the instructions on page 8-13, figure 1. Also recall the general rule: Manufactured head on the thinner material. | ||
==== Page 8-3 ==== | ==== Page 8-3 ==== | ||
* Step 3: The 1 21/32 lower flange width dimension is to be applied at the 1 inch line, not at 2 inches, the raw angle size. | * Step 3: The 1 21/32 lower flange width dimension is to be applied at the 1 inch line, not at 2 inches, the raw angle size. | ||
==== Page 8-7 ==== | ==== Page 8-7 ==== |
edits