3,763
edits
No edit summary |
m (→Page 8-3) |
||
Line 9: | Line 9: | ||
=== Notes === | === Notes === | ||
==== Page 8-2 ==== | |||
* Step 5: The manufactured head of the rivets attaching the doubler to the rear spar go onto the spar side to reduce the likelihood of interference with the elevator leading edge. | |||
==== Page 8-3 ==== | ==== Page 8-3 ==== |
edits