SECTION 10: TAILCONE: Difference between revisions

m
(Added mod ideas to consider while doing this section)
Line 96: Line 96:
Step 4 - If you plan to install additional air intakes for ventilation (e.g. an overhead console with air vents), you should purchase additional NACA vents from Van's (part SV-1) or at least find a good template and consider cutting the holes for these prior to riveting the side skins on to the tailcone.
Step 4 - If you plan to install additional air intakes for ventilation (e.g. an overhead console with air vents), you should purchase additional NACA vents from Van's (part SV-1) or at least find a good template and consider cutting the holes for these prior to riveting the side skins on to the tailcone.


Step 5 - If you already have the rudder cables, consider installing them along with rudder fairings (optional) at this point before riveting the aft deck. See [[Rudder_Cable_Fairings]].
Step 5 - If you already have the rudder cables, consider installing them along with rudder fairings (optional) at this point before riveting the aft deck. This will be MUCH easier to do now as some builders have reported spending several hours to do this step later. Instructions for installing the aft portion of the rudder cables are on page 38-8 (steps 1-4 is all you need to do at this point). If you also want to cover the plastic tubes on the side of the tailcone, see [[Rudder_Cable_Fairings]].


== Page 10-23 ==
== Page 10-23 ==
186

edits

MediaWiki spam blocked by CleanTalk.