3,777
edits
mNo edit summary |
|||
| Line 38: | Line 38: | ||
WD-1008-L / WD-1008-R step weldments have 16 holes each. The corresponding F-1021-L / F-1021-R outboard baggage ribs are missing four of these holes, with no instructions on the page to match drill. Vans support confirmed (12/15/2022 - Gary Keyser support engineer) that it is acceptable to match drill through the WD-1008 into the F-1021 and rivet. The plans corroborate this as they call out 32x AN470AD4-4 rivets. | WD-1008-L / WD-1008-R step weldments have 16 holes each. The corresponding F-1021-L / F-1021-R outboard baggage ribs are missing four of these holes, with no instructions on the page to match drill. Vans support confirmed (12/15/2022 - Gary Keyser support engineer) that it is acceptable to match drill through the WD-1008 into the F-1021 and rivet. The plans corroborate this as they call out 32x AN470AD4-4 rivets. | ||
[[Category:Hints]] | |||
edits