SECTION 10: TAILCONE: Difference between revisions

m
Line 37: Line 37:
* Don't assume the stiffeners are exactly 8 foot long and just measure how much to cut off, measure across the entire length to mark the cut-off line.
* Don't assume the stiffeners are exactly 8 foot long and just measure how much to cut off, measure across the entire length to mark the cut-off line.


== Page 10-8 ==
* Step 1: For hints, see this [https://vansairforce.net/community/showthread.php?t=193058 VAF thread]
== Page 10-13 ==
== Page 10-13 ==
There is a service bulletin (https://www.vansaircraft.com/wp-content/uploads/2018/03/sb18-03-30.pdf ) for the elevator stop (F-1012D). As mentioned in this YouTube build video (https://youtu.be/g5ONB4e28TI ), Van's did send the required material to create the new part with the rest of the kit (subkit #5), but did not update the plans to reflect the service bulletin.
There is a service bulletin (https://www.vansaircraft.com/wp-content/uploads/2018/03/sb18-03-30.pdf ) for the elevator stop (F-1012D). As mentioned in this YouTube build video (https://youtu.be/g5ONB4e28TI ), Van's did send the required material to create the new part with the rest of the kit (subkit #5), but did not update the plans to reflect the service bulletin.
3,777

edits

MediaWiki spam blocked by CleanTalk.