3,777
edits
| Line 1: | Line 1: | ||
=== Build Instruction Updates === | === Build Instruction Updates === | ||
* 10/05/21 [https://www.vansaircraft.com/wp-content/uploads/2021/04/29_10.pdf 29_10.pdf] | * 10/05/21 [https://www.vansaircraft.com/wp-content/uploads/2021/04/29_10.pdf 29_10.pdf] | ||
Check for more recent updates [https://www.vansaircraft.com/service-information-and-revisions/?aircraft=rv-10&doctype=revisions-changes&sort=date here] | |||
== 29-14 == | == 29-14 == | ||
* Step 5<br>When match drilling from the F-1001B angle into the WD-1002-L / WD-1002-R firewall steel brackets, be aware that it's easy to violate the edge distance in the steel bracket (2 x D, measured from the center of hole). Remedy is to temporarily install a bolt into the engine mount hole to pull the bracket into place and to use a clamp to move the steel bracket to increase edge distance.<br>See also [https://www.facebook.com/groups/vansrv10/posts/4932489646872095/ FB post 4/17/2022] | * Step 5<br>When match drilling from the F-1001B angle into the WD-1002-L / WD-1002-R firewall steel brackets, be aware that it's easy to violate the edge distance in the steel bracket (2 x D, measured from the center of hole). Remedy is to temporarily install a bolt into the engine mount hole to pull the bracket into place and to use a clamp to move the steel bracket to increase edge distance.<br>See also [https://www.facebook.com/groups/vansrv10/posts/4932489646872095/ FB post 4/17/2022] | ||
edits