Step 3 - Consider also using the center line on the back of the AEX tie down as an additional reference to center the AEX to the centerline of the F-1012A bulkhead. It can be difficult to accurately center the marked lines in the exact centers of the holes as referenced in the plans.
Step 3 - Consider also using the center line on the back of the AEX tie down as an additional reference to center the AEX to the centerline of the F-1012A bulkhead. It can be difficult to accurately center the marked lines in the exact centers of the holes as referenced in the plans.
- 5/28/22 I did it per the plans, drawing the two lines exactly.  Now use a cleco CLAMP on the bottom (threaded end) and a wood C clamp on the top gently holding it in place while you drill the 4 holes.  A little confusing in the plans it calls to drill the 3/32 out w/ a # 30 drill.  Correct.  It's a 3/32 hole oversize it to #30 so it will receive a -4 (4/32) rivet down line. See page 10-18 for rivet size.  Drill the 4 #30 holes first and cleco as you go.  Then drill the 3/16 holes also clecoing if you have 3/16 clecos. 
[[File:2022-05-28 15-36-10.jpg|thumb|Tie down assembly]]
Step 1: 5/28/22 Taping the Tie down.  Note: The hole should first be drilled out to 5/16 to receive a 3/8-16 tap.  The hole is undersized by Vans.  A trick a machinist taught me, put the tap in your drill press and center your piece under while turning the tap BY HAND.  DON'T turn on the drill!  It's just a jig to keep things straight while you start the tap.  Once you get a couple turns on the tap, take it out, put in your vice and finish. 
[[File:Sec 10-2 Tap drill.jpg|thumb|Tap drilling]]