2
edits
(Added builder video section + Video from Minos Pilacoutas) |
m (→Modifications to Consider: Updated links) |
||
| Line 30: | Line 30: | ||
* VOR antenna if desired under the tailcone or top of VS | * VOR antenna if desired under the tailcone or top of VS | ||
** A coax for the VOR antenna -- route a 25ft coax with a male BNC connector to the base of the vertical stabilizer. 25 feet of cable allows an unbroken run all the way to the control panel; each connector results in a drop in signal strength, so the minimum should be used. | ** A coax for the VOR antenna -- route a 25ft coax with a male BNC connector to the base of the vertical stabilizer. 25 feet of cable allows an unbroken run all the way to the control panel; each connector results in a drop in signal strength, so the minimum should be used. | ||
* The tie down ring and the jam nut is not included in the kit.<br>Consider | * The tie down ring and the jam nut is not included in the kit.<br>Consider these sources: | ||
** [https://www.cleavelandtool.com/ | ** [https://www.cleavelandtool.com/shop/rvtr4-stainless-tie-down-ring-36 Cleaveland Tie Down] | ||
** [https://marineboltsupply.com/ | ** [https://marineboltsupply.com/products/type-316-stainless-steel-size-3-8-16-hex-jam-nuts?variant=42275483746366 3/8-16 Stainless Jam Nut at Marine Bolt Supply] | ||
* Consider rudder cables before completing the tailcone. It is much easier to do before the top skin is riveted than to climb inside later. | * Consider rudder cables before completing the tailcone. It is much easier to do before the top skin is riveted than to climb inside later. | ||
** Complete section 10 up to page 10-21 step 4. Do not rivet the Aft Deck assembly (F-1014) or the Top Skin (F-1075) until you are happy with the wiring. | ** Complete section 10 up to page 10-21 step 4. Do not rivet the Aft Deck assembly (F-1014) or the Top Skin (F-1075) until you are happy with the wiring. | ||
edits