3
edits
m (→29-5) |
(Added note on 29-16 Step 4 about riveting F-1042E brackets before installing side channels.) |
||
Line 115: | Line 115: | ||
== 29-16 == | == 29-16 == | ||
* Step 4: Rivet the F-1042E-L/R brackets to F-01042-L/R before clecoing the F-1040 side channels. It is easier setting these rivets now than after the side channels are installed. | |||
* Step 5: The most forward rivet on the bottom part of the lower firewall bracket is hard to reach. Some trim the top flange of the bracket to allow for using an offset rivet set, others use a large 16" Knipex pair of pliers with a makeshift die for the manufactured head. See this [https://www.facebook.com/groups/vansrv10/posts/8092829177504777 FB thread].<br>[[File:Screenshot 2024-09-13 at 8.27.25 AM.png|300x300px]] | * Step 5: The most forward rivet on the bottom part of the lower firewall bracket is hard to reach. Some trim the top flange of the bracket to allow for using an offset rivet set, others use a large 16" Knipex pair of pliers with a makeshift die for the manufactured head. See this [https://www.facebook.com/groups/vansrv10/posts/8092829177504777 FB thread].<br>[[File:Screenshot 2024-09-13 at 8.27.25 AM.png|300x300px]] | ||
edits