SECTION 21: AILERON: Difference between revisions

Jump to navigation Jump to search
m
Line 20: Line 20:


Step 5: Mark the top, sloped trim lines before cutting the stiffeners apart else you cut the reference points away.
Step 5: Mark the top, sloped trim lines before cutting the stiffeners apart else you cut the reference points away.
==Page 21-09==
Step 4: Make sure the tabs of the 4 outer ribs grab the flange of the spar. Make sure the smaller bottom end ribs (A-1005B-1) go inside the larger ones from the top (A-1005A-1).


[[Category:Hints]]
[[Category:Hints]]
3,763

edits

Navigation menu

MediaWiki spam blocked by CleanTalk.