Check for more recent updates [https://www.vansaircraft.com/service-information-and-revisions/?aircraft=rv-10&doctype=revisions-changes&sort=date here] | Check for more recent updates [https://www.vansaircraft.com/service-information-and-revisions/?aircraft=rv-10&doctype=revisions-changes&sort=date here] | ||
=== Before You Start === | |||
==== Modifications to Consider ==== | |||
* Some people decide to install extended-range fuel tanks. At least for some options ([[SkyDesigns Installation Hints]]) it will save you some time to start making the necessary modifications now. | |||
* [https://cleavelandtool.com/products/threaded-extruded-aex-tie-down-block Consider buying two pre-tapped AEX tie-downs] | |||
== Hints == | |||
==== Page 13-2 ==== | ==== Page 13-2 ==== | ||
''Note: steps 5-8 may be less confusing with a bit of context. You are using the spar flanges as templates for drilling the J-channel stiffeners. They will not be attached to the spar in the end. After you finish step 8 you will not need the J-channel until a later section. You can debur and prime now or later.'' | |||
* Figure 1 shows an "extra" hole on the flange. It is not used anywhere, does not need countersinking.<br>[[File:2022-08-05 15-56-39.jpg|500x500px]] | * Figure 1 shows an "extra" hole on the flange. It is not used anywhere, does not need countersinking.<br>[[File:2022-08-05 15-56-39.jpg|500x500px]] | ||
* Step 7: Study figure 2 which points out that the long stiffeners align at the outboard end while the short stiffeners align at the inboard end. | * Step 7: Study figure 2 which points out that the long stiffeners align at the outboard end while the short stiffeners align at the inboard end. | ||
| Line 13: | Line 22: | ||
** See [https://youtu.be/-fJUMhbf7zY?si=izdFC36iiTjpQI1A&t=685 Plane Lady's youtube video] explaining which holes (starting at 11:25) | ** See [https://youtu.be/-fJUMhbf7zY?si=izdFC36iiTjpQI1A&t=685 Plane Lady's youtube video] explaining which holes (starting at 11:25) | ||
** She diagrams the holes at [https://youtu.be/-fJUMhbf7zY?si=iNIxa28amTkntwUa&t=903 15:00 in the video]. Essentially, they are the holes between the fuel tank nut plates (forward row nut plates) that would be covered by the fuel tank flange. | ** She diagrams the holes at [https://youtu.be/-fJUMhbf7zY?si=iNIxa28amTkntwUa&t=903 15:00 in the video]. Essentially, they are the holes between the fuel tank nut plates (forward row nut plates) that would be covered by the fuel tank flange. | ||
==== Page 13-3 ==== | |||
* Step 9: Skip this step if either (or both) of the following are true: | |||
** You are installing Sky Designs ER fuel tanks -- since they are two ribs wider you won't want this wire passthrough here | |||
** You are NOT installing the standard mechanical stall switch -- this hole is for wiring for that device. | |||