QB Fuselage: Difference between revisions
Created page with "=== Tools === * #36 drill bit to drill out 1/8 pop rivets === Links === * [http://operationrv10.blogspot.com/2016/04/the-rv-10-quickbuild-details-and.html Operation RV-10 (2016)] * [https://vansairforce.net/community/showthread.php?t=184876 Vansairforce Thread (2020)] === Additional Comments === * References to "Page 28-16: Both sets of F-1057 L/R Mid-Seat Rail Supports" are outdated as newer fuselages no longer have this part. * "Page 27-2: If going with a Lycoming e..."
(Created page with "=== Tools === * #36 drill bit to drill out 1/8 pop rivets === Links === * [http://operationrv10.blogspot.com/2016/04/the-rv-10-quickbuild-details-and.html Operation RV-10 (2016)] * [https://vansairforce.net/community/showthread.php?t=184876 Vansairforce Thread (2020)] === Additional Comments === * References to "Page 28-16: Both sets of F-1057 L/R Mid-Seat Rail Supports" are outdated as newer fuselages no longer have this part. * "Page 27-2: If going with a Lycoming e...") |
(No difference)
|