Line 15: Line 15:
* Step 2: The most forward 426AD3-3.5 rivet can only be done with the back-riveting technique. Consider getting a [https://www.cleavelandtool.com/products/back-rivet-set-12 long back rivet set].
* Step 2: The most forward 426AD3-3.5 rivet can only be done with the back-riveting technique. Consider getting a [https://www.cleavelandtool.com/products/back-rivet-set-12 long back rivet set].
* Step 3: The AN426AD3-4.5 rivets that attach the F-1026 Lower Baggage Door Seal Channel are too short, consider using longer ones. The rivets are hard to buck but you can insert a [https://www.cleavelandtool.com/products/tungsten-bucking-bar-41 5/8" x 1" x 4" (long, slim) tungsten bar] with the angled end towards the rivet.
* Step 3: The AN426AD3-4.5 rivets that attach the F-1026 Lower Baggage Door Seal Channel are too short, consider using longer ones. The rivets are hard to buck but you can insert a [https://www.cleavelandtool.com/products/tungsten-bucking-bar-41 5/8" x 1" x 4" (long, slim) tungsten bar] with the angled end towards the rivet.