3,777
edits
m (→Page 32-3) |
mNo edit summary |
||
| Line 45: | Line 45: | ||
* Step 18, installing two SB625-7 snap bushings: those shipped with the empennage kit, not part of the fuselage kit / fuselage QB kit.<br>Don't install any of the snap bushings yet that carry the rudder cable. You cannot get the rudder cable end fitting through the snap bushings if they are mounted as they need to be squeezed oval to let them through. Install the snap bushings along with the rudder cable install instructions on page 38-8. | * Step 18, installing two SB625-7 snap bushings: those shipped with the empennage kit, not part of the fuselage kit / fuselage QB kit.<br>Don't install any of the snap bushings yet that carry the rudder cable. You cannot get the rudder cable end fitting through the snap bushings if they are mounted as they need to be squeezed oval to let them through. Install the snap bushings along with the rudder cable install instructions on page 38-8. | ||
*Once you are done with the tailcone attach, add two AN960-8 washers and AN515-8R8 screws to the frontmost two holes of the F-1035 battery mount. The nutplates are now installed. The build instructions don't cover those two holes. | *Once you are done with the tailcone attach, add two AN960-8 washers and AN515-8R8 screws to the frontmost two holes of the F-1035 battery mount. The nutplates are now installed. The build instructions don't cover those two holes. | ||
[[Category:Hints]] | |||
edits