SECTION 29: FUSE SIDE SKINS: Difference between revisions

Jump to navigation Jump to search
m
Line 9: Line 9:


== 29-15 ==
== 29-15 ==
* Questions on which holes to dimple? See [https://www.facebook.com/groups/vansrv10/posts/5839137336207317 this FB thread]
* Questions on which holes to dimple? See [https://www.facebook.com/groups/vansrv10/posts/5839137336207317 this FB thread]. Another [https://www.facebook.com/groups/vansrv10/posts/6453842408070137 FB thread on same topic]
 
== 29-20 ==
== 29-20 ==
* Don't rivet the forward cabin floor to the center tunnel walls if you are getting electronic injection (SDS or EFII), or you intend to install access covers to the side of the tunnel as the rivet holes will be needed. For the SDS pump shelf, you will have 5 stock rivets counting from front, then the next 11 are to be left out for the fuel pump shelf. For the access covers, see the instructions from Airward.
* Don't rivet the forward cabin floor to the center tunnel walls if you are getting electronic injection (SDS or EFII), or you intend to install access covers to the side of the tunnel as the rivet holes will be needed. For the SDS pump shelf, you will have 5 stock rivets counting from front, then the next 11 are to be left out for the fuel pump shelf. For the access covers, see the instructions from Airward.