3
edits
(Added a note about the hole disparity on the step weldments.) |
|||
| Line 21: | Line 21: | ||
Double check that the left and right WD-1008-L / WD-1008-R step weldment parts are labelled correctly by Vans. There are two reports of them being swapped. | Double check that the left and right WD-1008-L / WD-1008-R step weldment parts are labelled correctly by Vans. There are two reports of them being swapped. | ||
See also [https://www.facebook.com/groups/vansrv10/posts/4902491573205236 FB Post 4/6/2022]. | See also [https://www.facebook.com/groups/vansrv10/posts/4902491573205236 FB Post 4/6/2022]. | ||
WD-1008-L / WD-1008-R step weldments have 16 holes each. The corresponding F-1021-L / F-1021-R outboard baggage ribs are missing four of these holes, with no instructions on the page to match drill. Vans support confirmed (12/15/2022 - Gary Keyser support engineer) that it is acceptable to match drill through the WD-1008 into the F-1021 and rivet. The plans corroborate this as they call out 32x AN470AD4-4 rivets. | |||
edits