SECTION 32: TAILCONE ATTACHMENT: Difference between revisions

Jump to navigation Jump to search
m
mNo edit summary
Line 42: Line 42:
== Page 32-5 ==
== Page 32-5 ==
* Step 6 refers to "Page 33-4, Figure 3", correct is "Page 32-4, Figure 3". Also, debur the 6 holes before dimpling as they were recently match drilled.
* Step 6 refers to "Page 33-4, Figure 3", correct is "Page 32-4, Figure 3". Also, debur the 6 holes before dimpling as they were recently match drilled.
* Step 18, installing two SB625-7 snap bushings: those shipped with the empennage kit, not part of the fuselage kit / fuselage QB kit.
* Step 18, installing two SB625-7 snap bushings: those shipped with the empennage kit, not part of the fuselage kit / fuselage QB kit.<br>Don't install any of the snap bushings yet that carry the rudder cable. You cannot get the rudder cable end fitting through the snap bushings if they are mounted as they need to be squeezed oval to let them through. Install the snap bushings along with the instructions on page 38-8.
3,777

edits

Navigation menu

MediaWiki spam blocked by CleanTalk.