3,777
edits
mNo edit summary |
|||
| Line 24: | Line 24: | ||
*** Mount the valve and insert the extension tube | *** Mount the valve and insert the extension tube | ||
*** Upsize the fuel valve hole in the tunnel cover so the extension fits easily through it. | *** Upsize the fuel valve hole in the tunnel cover so the extension fits easily through it. | ||
*** Secure the tunnel cover to the tunnel. | *** Secure the tunnel cover to the tunnel. [[File:2023-07-15 19-07-18.jpg|400x400px]] | ||
edits