SECTION 27: FIREWALL: Difference between revisions

m
no edit summary
mNo edit summary
Line 1: Line 1:
'''PAGE 27-3.'''
Part F-1051J Scat Tube Support is installed on Page 50-2, Step 1.
=== Build Instruction Updates ===
=== Build Instruction Updates ===
* N/A
* N/A
Line 16: Line 12:
==== Step 7 ====
==== Step 7 ====
Note when riveting F-1001M Left Side Angle, you need to leave the 2  holes that intersect the Oil Cooler Box Attach Holes open so that they can be used to attach the oil cooler in Section FF1-2
Note when riveting F-1001M Left Side Angle, you need to leave the 2  holes that intersect the Oil Cooler Box Attach Holes open so that they can be used to attach the oil cooler in Section FF1-2
== PAGE 27-3 ==
* Part F-1051J Scat Tube Support is installed on Page 50-2, Step 1.


== PAGE 27-4 ==
== PAGE 27-4 ==
* Step 6: The manual doesn't spell out that you need to dimple the screw holes of the K1100-08 nutplates. See page 26-2, step 5 as reference.
* Step 6: The manual doesn't spell out that you need to dimple the screw holes of the K1100-08 nutplates. See page 26-2, step 5 as reference.
* Step 8: If you are planning to use the Andair fuel selector you might want to hold off riveting the F-1048C-1 Fuel Valve Bracket to the fwd fuselage ribs, as the Andair selector does not fit this bracket.
* Step 8: If you are planning to use the Andair fuel selector you might want to hold off riveting the F-1048C-1 Fuel Valve Bracket to the fwd fuselage ribs, as the Andair selector does not fit this bracket.
3,763

edits

MediaWiki spam blocked by CleanTalk.