3,763
edits
m (→Page 21-03) |
m (→Page 21-05) |
||
Line 20: | Line 20: | ||
Step 5: Mark the top, sloped trim lines before cutting the stiffeners apart else you cut the reference points away. | Step 5: Mark the top, sloped trim lines before cutting the stiffeners apart else you cut the reference points away. | ||
==Page 21-09== | |||
Step 4: Make sure the tabs of the 4 outer ribs grab the flange of the spar. Make sure the smaller bottom end ribs (A-1005B-1) go inside the larger ones from the top (A-1005A-1). | |||
[[Category:Hints]] | [[Category:Hints]] |
edits