Build Instruction Updates

Check for more recent updates here

Before You Start

Special/New Tools/Supplies

  • You will need to build some wooden support braces (see page 8-7, step 5).

Notes

Page 8-3

  • Step3: The 1 21/32 lower flange width dimension is to be applied at the 1 inch line, not at 2 inches, the raw angle size.

Page 8-7

  • Step 3: only cut back the two corners on the front edge of the nose rib, not the entire edge because then you will violate the edge distance for the foremost rivet. See also this FB thread.
  • Step 4: Very likely that the nose rib that came with a recent kit already has the holes in the web that step 4 calls out for making

Page 8-13

  • Please read the notes in figure 1, they spell out that all the manufactured heads are on the outside (rear) of the spar. This helps with avoiding elevator leading edge binding.