SECTION 27: FIREWALL
Build Instruction Updates
- N/A
Check for more recent updates here
PAGE 27-2
- For additional info on the firewall in general, see also section QB_Fuselage
- Plan your control cables pass-throughs at step 3
- Some people have used an "eyeball" type here that may require different spacing than the pre-punched holes provided in the kit.
Many use these for the control cable penetrations (at Spruce: EYEBALL FIREWALL FITTING- SS PRESSURE PLATE - STEEL TTP):
More products, including double cable models are here: http://www.doubleteeproducts.com/doubleteefirewallproducts/ - Look ahead in the plans to see if you want to do the double plastic bushing. The RV-14 kit uses an FF-00001 to penetrate the firewall:
- Many people have used the following pass-thru with the RV-10 (at Spruce: Avery SS Firewall Pass-Thru):
Step 4
- Several builders are reporting that part WD-1002-L-PC / WD-1002-R-PC is being labelled incorrectly. If you ended up with two of the same kind, Vans will be happy to swap them out.
Step 7
- Note when riveting F-1001M Left Side Angle, you need to leave the 2 holes that intersect the Oil Cooler Box Attach Holes open so that they can be used to attach the oil cooler in Section FF1-2
PAGE 27-3
- Part F-1051J Scat Tube Support is installed on Page 50-2, Step 1.
PAGE 27-4
- Step 6: The manual doesn't spell out that you need to dimple the screw holes of the K1100-08 nutplates. See page 26-2, step 5 as reference.
- Step 8: If you are planning to use the Andair fuel selector you might want to hold off riveting the F-1048C-1 Fuel Valve Bracket to the fwd fuselage ribs, as the Andair selector does not fit this bracket.