SECTION 38: RUDDER PEDALS & BRAKE SYSTEM

From RV10 Community Wiki
Revision as of 06:17, 19 December 2022 by Martin (talk | contribs) (→‎Step 2)
Jump to navigation Jump to search

Build Instruction Updates

Check for more recent updates here

Page 38-4

Step 5

  • The manual only shows how to install the pedals in the forward position. It is also possible to install the pedals one hole further back to accommodate pilots with shorter legs. One can adjust the seat for and back in the RV-10 but that does not change the distance between the control stick and the pedals. Page 38-10, step 1 shows how to tailor the rudder cable link for the two rudder pedal mounting options which shows it is supported.
  • The QuickBuild fuselage might have the holes in the longeron for the Bearing Block Mount Plate F-1039B drilled a little bit off spec which might need adjustment with a round file or match drilling.

page 38-5

Page 38-8

Step 2

  • Before inserting the rudder cable consider adding a rudder cable fairing to your build. Avery makes a suitable fairing and is available from e.g. Aircraft Spruce. Draw lines 1 inch above and below the exit hole.

  • It's hard to do all at once. Best to first get just the screw test threaded and backed out. Then capture just the cable with the adel clamp, hold the adel clamp closed with a temporary safety wire or a Hemostat and get the bolt in a few threads deep. Then remove the safety wire or Hemostat and capture and position the cable sleeve. Lastly tighten the bolt.