186
edits
No edit summary |
No edit summary |
||
| Line 18: | Line 18: | ||
* Step 3: The number of holes in the top flanges of the F-1015C Mid Cabin Decks is one greater than the number of holes drilled into the F-1013 longerons using the template. I haven't finished the chapter yet so I'm not sure what will happen, but for now I'm not match-drilling that extra hole. I'll try to remember to update this when I'm done with this chapter. | * Step 3: The number of holes in the top flanges of the F-1015C Mid Cabin Decks is one greater than the number of holes drilled into the F-1013 longerons using the template. I haven't finished the chapter yet so I'm not sure what will happen, but for now I'm not match-drilling that extra hole. I'll try to remember to update this when I'm done with this chapter. | ||
== 29-9 == | |||
* Step 3: I managed to violate the edge distance when match-drilling into the longeron. In my case, I don't think the curve in the longeron was quite right the first time. It's tough because you are match-drilling from underneath, but make sure that you are not drilling too close to the edge of the longeron. You can draw a line with your Sharpee at 3/16" from the outside edge of the lower flange and the color it in -- then use an inspection mirror when clamping onto the bracket below. If you can see any Sharpee through the holes then you are too close to the edge to match drill that hole. | |||
== 29-11 == | == 29-11 == | ||
edits