3,777
edits
m (→29-15) |
m (→29-20) |
||
| Line 11: | Line 11: | ||
* Questions on which holes to dimple? See [https://www.facebook.com/groups/vansrv10/posts/5839137336207317 this FB thread] | * Questions on which holes to dimple? See [https://www.facebook.com/groups/vansrv10/posts/5839137336207317 this FB thread] | ||
== 29-20 == | == 29-20 == | ||
* Don't rivet the forward cabin floor to the center tunnel walls if you are getting electronic injection (SDS or EFII), or you intend to install access covers to the side of the tunnel as the rivet holes will be needed. | * Don't rivet the forward cabin floor to the center tunnel walls if you are getting electronic injection (SDS or EFII), or you intend to install access covers to the side of the tunnel as the rivet holes will be needed. For the SDS pump shelf, you will have 5 stock rivets counting from front, then the next 11 are to be left out for the fuel pump shelf. | ||
edits