SECTION 27: FIREWALL

Revision as of 22:27, 20 September 2022 by Martin (talk | contribs) (→‎PAGE 27-4)

PAGE 27-3.

Part F-1051J Scat Tube Support is installed on Page 50-2, Step 1.

Build Instruction Updates

  • N/A

Check for more recent updates here

PAGE 27-2

Step 7

Note when riveting F-1001M Left Side Angle, you need to leave the 2 holes that intersect the Oil Cooler Box Attach Holes open so that they can be used to attach the oil cooler in Section FF1-2

PAGE 27-4

  • Step 6: The manual doesn't spell out that you need to dimple the screw holes of the K1100-08 nutplates. See page 26-2, step 5 as reference.
  • Step 8: If you are planning to use the Andair fuel selector you might want to hold off riveting the F-1048C-1 Fuel Valve Bracket to the fwd fuselage ribs, as the Andair selector does not fit this bracket.
MediaWiki spam blocked by CleanTalk.