SECTION 27: FIREWALL

From RV10 Community Wiki
Revision as of 06:19, 25 July 2022 by Hoz (talk | contribs) (→‎PAGE 27-2)
Jump to navigation Jump to search

Build Instruction Updates

  • N/A

Check for more recent updates here

PAGE 27-2

  • For additional info, see also section QB_Fuselage
  • Plan your control cables pass-throughs at step 3
  • Some people have used an "eyeball" type here that may require different spacing than the pre-punched holes provided in the kit.
    Many use these for the control cable penetrations (at Spruce: EYEBALL FIREWALL FITTING- SS PRESSURE PLATE - STEEL TTP):
  • Look ahead in the plans to see if you want to do the double plastic bushing. The RV-14 kit uses an FF-00001 to penetrate the firewall:
  • Many people have used the following pass-thru with the RV-10 (at Spruce: Avery SS Firewall Pass-Thru):

Step 7

Note when riveting F-1001M Left Side Angle, you need to leave the 2 holes that intersect the Oil Cooler Box Attach Holes open so that they can be used to attach the oil cooler in Section FF1-2