SECTION 15: REAR SPAR: Difference between revisions

From RV10 Community Wiki
Jump to navigation Jump to search
mNo edit summary
Line 5: Line 5:
* Step 1: Match-drilling 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges [[File:2022-05-28 15-14-05.jpg|600x600px]] <br> <br>[[File:2022-05-28 15-13-41.jpg|600x600px]]
* Step 1: Match-drilling 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges [[File:2022-05-28 15-14-05.jpg|600x600px]] <br> <br>[[File:2022-05-28 15-13-41.jpg|600x600px]]
* Read through the Service Bulletin [https://www.vansaircraft.com/service-information-and-revisions/sb-16-03-28 SB-16-03-28] to better understand the assembly (ignore the drill-out instructions).
* Read through the Service Bulletin [https://www.vansaircraft.com/service-information-and-revisions/sb-16-03-28 SB-16-03-28] to better understand the assembly (ignore the drill-out instructions).
*See also [https://www.facebook.com/groups/vansrv10/posts/5079099468877778/ FB post 6/9/2022]

Revision as of 16:10, 9 June 2022

Page 15-2

(FB 3/20/2022) Aileron bracket errors[Ed: this page isn't very useful, as you have to be a member and logged into Facebook to see it)

Page 15-5

  • Step 1: Match-drilling 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges

  • Read through the Service Bulletin SB-16-03-28 to better understand the assembly (ignore the drill-out instructions).
  • See also FB post 6/9/2022