SECTION 37: FUEL SYSTEM: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary Tags: Mobile edit Mobile web edit |
||
| Line 2: | Line 2: | ||
* N/A | * N/A | ||
Check for more recent updates [https://www.vansaircraft.com/service-information-and-revisions/?aircraft=rv-10&doctype=revisions-changes&sort=date here] | Check for more recent updates [https://www.vansaircraft.com/service-information-and-revisions/?aircraft=rv-10&doctype=revisions-changes&sort=date here] | ||
=== Hints === | |||
==== Page 37-2 ==== | |||
Step 4: The firewall fitting needs to point slightly down to not interfere with the heater valve.<br>If you are installing electronic injection, the line from the pump goes to the left side (mirror the hole) and the return line to the right. Consider using steel fittings for firewall and engine compartment. | |||
[[Category:Hints]] | [[Category:Hints]] | ||
Revision as of 00:13, 22 January 2024
Build Instruction Updates
- N/A
Check for more recent updates here
Hints
Page 37-2
Step 4: The firewall fitting needs to point slightly down to not interfere with the heater valve.
If you are installing electronic injection, the line from the pump goes to the left side (mirror the hole) and the return line to the right. Consider using steel fittings for firewall and engine compartment.