3,777
edits
m (→Page 33-7) |
m (→Page 33-7) |
||
| Line 12: | Line 12: | ||
* Step 1-4 say "Standard Kit" only, but needs completion on quick build kits as well | * Step 1-4 say "Standard Kit" only, but needs completion on quick build kits as well | ||
= Page 33-7 = | = Page 33-7 = | ||
* Step 1: | * Step 1: Reminder: the center two nutplates on the rear flange are MS21051-L08 (asymmetric, the two rivets are on the same side). | ||
* Step 2: The most forward 426AD3-3.5 rivet can only be done with the back-riveting technique. Consider getting a [https://www.cleavelandtool.com/products/back-rivet-set-12 long back rivet set]. | * Step 2: The most forward 426AD3-3.5 rivet can only be done with the back-riveting technique. Consider getting a [https://www.cleavelandtool.com/products/back-rivet-set-12 long back rivet set]. | ||
* Step 3: The AN426AD3-4.5 rivets that attach the F-1026 Lower Baggage Door Seal Channel are too short, consider using longer ones. The rivets are hard to buck but you can insert a [https://www.cleavelandtool.com/products/tungsten-bucking-bar-41 5/8" x 1" x 4" (long, slim) tungsten bar] with the angled end towards the rivet. | * Step 3: The AN426AD3-4.5 rivets that attach the F-1026 Lower Baggage Door Seal Channel are too short, consider using longer ones. The rivets are hard to buck but you can insert a [https://www.cleavelandtool.com/products/tungsten-bucking-bar-41 5/8" x 1" x 4" (long, slim) tungsten bar] with the angled end towards the rivet. | ||
edits