SECTION 33: BAGGAGE AREA: Difference between revisions

Jump to navigation Jump to search
m
Line 12: Line 12:
* Step 1-4 say "Standard Kit" only, but needs completion on quick build kits as well
* Step 1-4 say "Standard Kit" only, but needs completion on quick build kits as well
= Page 33-7 =
= Page 33-7 =
* Step 1: The center two nutplates on the rear flange are supposed to be MS21051-L08 (asymmetric, the two rivets are on the same side), however the QB might come with holes and dimples that assume a K1000-08 nutplate. Consider changing the QB to the drawing, otherwise, two additional holes are needed on the F-1006 Bulkhead as the two center holes will not line up with the asymmetric nutplate.
* Step 1: The center two nutplates on the rear flange are supposed to be MS21051-L08 (asymmetric, the two rivets are on the same side), however the QB might come with holes and dimples that assume a K1000-08 nutplate. Consider changing the QB to the drawing, otherwise, two additional holes are needed at the F-1006 Bulkhead bottom as the two center holes will not line up with the asymmetric nutplate.
3,777

edits

Navigation menu

MediaWiki spam blocked by CleanTalk.