Tony's Build Instructions: Difference between revisions
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
One important modification of the cradle build instructions is to make the rear bar removable to allow riveting the tailcone to the fuselage. Use a SIMPSON STRONG-TIE 1-13/16" x 5" 22 Gauge Nail Plate on both sides to hold the rear carpet covered bar. | One important modification of the cradle build instructions is to make the rear bar removable to allow riveting the tailcone to the fuselage. Use a SIMPSON STRONG-TIE 1-13/16" x 5" 22 Gauge Nail Plate on both sides to hold the rear carpet covered bar. | ||
[[File:Cradle_mod2.jpeg|500px]] | |||
A 20 inch inner tube can be used to lift the fuselage. |
Revision as of 05:44, 24 March 2022
Modifications
One important modification of the cradle build instructions is to make the rear bar removable to allow riveting the tailcone to the fuselage. Use a SIMPSON STRONG-TIE 1-13/16" x 5" 22 Gauge Nail Plate on both sides to hold the rear carpet covered bar.
A 20 inch inner tube can be used to lift the fuselage.