3,777
edits
m (→Page 10-23) |
m (→Page 10-13) |
||
| Line 37: | Line 37: | ||
* Don't assume the stiffeners are exactly 8 foot long and just measure how much to cut off, measure across the entire length to mark the cut-off line. | * Don't assume the stiffeners are exactly 8 foot long and just measure how much to cut off, measure across the entire length to mark the cut-off line. | ||
== Page 10-8 == | |||
* Step 1: For hints, see this [https://vansairforce.net/community/showthread.php?t=193058 VAF thread] | |||
== Page 10-13 == | == Page 10-13 == | ||
There is a service bulletin (https://www.vansaircraft.com/wp-content/uploads/2018/03/sb18-03-30.pdf ) for the elevator stop (F-1012D). As mentioned in this YouTube build video (https://youtu.be/g5ONB4e28TI ), Van's did send the required material to create the new part with the rest of the kit (subkit #5), but did not update the plans to reflect the service bulletin. | There is a service bulletin (https://www.vansaircraft.com/wp-content/uploads/2018/03/sb18-03-30.pdf ) for the elevator stop (F-1012D). As mentioned in this YouTube build video (https://youtu.be/g5ONB4e28TI ), Van's did send the required material to create the new part with the rest of the kit (subkit #5), but did not update the plans to reflect the service bulletin. | ||
edits