SECTION 13: MAIN SPAR: Difference between revisions

From RV10 Community Wiki
Jump to navigation Jump to search
Line 6: Line 6:
* Figure 1 shows an "extra" hole on the flange. It is not used anywhere, does not need countersinking.<br>[[File:2022-08-05 15-56-39.jpg|500x500px]]
* Figure 1 shows an "extra" hole on the flange. It is not used anywhere, does not need countersinking.<br>[[File:2022-08-05 15-56-39.jpg|500x500px]]
* Step 7: Study figure 2 which points out that the long stiffeners align at the outboard end while the short stiffeners align at the inboard end.
* Step 7: Study figure 2 which points out that the long stiffeners align at the outboard end while the short stiffeners align at the inboard end.
* Step 8: See this [https://www.facebook.com/groups/vansrv10/posts/5941123952675321 FB thread] regarding how to manage the imperfect overlay of the long and short stiffener.


==== Page 13-4 ====
==== Page 13-4 ====
* Step 4 has you installing AN426AD4-6 rivets, but the rivets are not part of the SB kit (as of 3/2022).
* Step 4 has you installing AN426AD4-6 rivets, but the rivets are not part of the SB kit (as of 3/2022).
**Some builders indicate that the rivets are included in the SB kits.
**Some builders indicate that the rivets are included in the SB kits.

Revision as of 23:15, 29 March 2023

Build Instruction Updates

  • N/A

Check for more recent updates here

Page 13-2

  • Figure 1 shows an "extra" hole on the flange. It is not used anywhere, does not need countersinking.
  • Step 7: Study figure 2 which points out that the long stiffeners align at the outboard end while the short stiffeners align at the inboard end.
  • Step 8: See this FB thread regarding how to manage the imperfect overlay of the long and short stiffener.

Page 13-4

  • Step 4 has you installing AN426AD4-6 rivets, but the rivets are not part of the SB kit (as of 3/2022).
    • Some builders indicate that the rivets are included in the SB kits.