4
edits
No edit summary |
|||
| Line 5: | Line 5: | ||
== Preparation == | == Preparation == | ||
Make sure you have enough clecos. During the initial assembly, I used about 650 clecos. | Make sure you have enough clecos. During the initial assembly, I used about 650 clecos. | ||
== Page 10-2 == | |||
Step 3 - Consider also using the center line on the back of the AEX tie down as an additional reference to center the AEX to the centerline of the F-1012A bulkhead. It can be difficult to accurately center the marked lines in the exact centers of the holes as referenced in the plans. | |||
== Page 10-5 == | == Page 10-5 == | ||
edits