[[File:Heat Box plans.jpg|thumb|Heat box plans]] | [[File:Heat Box plans.jpg|thumb|Heat box plans]] | ||
If you are going to install any sort additional heat/fire protection on the hot side of the firewall, you probably want to hold off on installing the VENT TG-10-L until after you have finished that process. Although now would be a great time to prep/trim any such additional insulation, you can't install it until much later when all of the rivets are complete. | If you are going to install any sort additional heat/fire protection on the hot side of the firewall, you probably want to hold off on installing the VENT TG-10-L and TG-10-R (or their stainless steel version) until after you have finished that process. Although now would be a great time to prep/trim any such additional insulation, you can't install it until much later when all of the rivets are complete. | ||
[[Category:Hints]] | [[Category:Hints]] |