SECTION FF5: OIL SYSTEM: Difference between revisions

m
(Created page with "=== Build Instruction Updates === * 02/24/05 [https://www.vansaircraft.com/wp-content/uploads/2021/10/FF5_10.pdf FF5_10.pdf]")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
=== Build Instruction Updates ===
=== Build Instruction Updates ===
* 02/24/05 [https://www.vansaircraft.com/wp-content/uploads/2021/10/FF5_10.pdf FF5_10.pdf]
* 10/05/21 [https://www.vansaircraft.com/wp-content/uploads/2021/10/FF5_10.pdf FF5_10.pdf]
Check for more recent updates [https://www.vansaircraft.com/service-information-and-revisions/?aircraft=rv-10&doctype=revisions-changes&sort=date here]
 
====== Page FF5-3 ======
* Step 3: The 4 inch duct hose as is won't go over the rim of the fittings on either ends. One needs to bend the end of the wire 90 degrees inwards, then detach the wire from the hose on the inside and push it in further so the area that overlaps the fitting has no wires. Same goes for the cord on the outside, it needs to be removed in the overlap area.
 
[[Category:Hints]]
3,777

edits

MediaWiki spam blocked by CleanTalk.