SECTION 35: ACCESS COVERS AND FLOOR PANELS: Difference between revisions

From RV10 Community Wiki
Jump to navigation Jump to search
Line 5: Line 5:
==== Page 35-2 ====
==== Page 35-2 ====
* Step 1 - this step needs to be also done for the Quick Build, it says "Standard Kit" only. The holes are only drilled 1/8th and need to be match drilled to #30. Also the holes on the front that need to be match drilled into the main spar aren't done with the Quick Build.
* Step 1 - this step needs to be also done for the Quick Build, it says "Standard Kit" only. The holes are only drilled 1/8th and need to be match drilled to #30. Also the holes on the front that need to be match drilled into the main spar aren't done with the Quick Build.
* Step 5 - Figure 2 shows AD470AD4-4 rivets along the outboard foot well rib. There are though two rivets that go through the seat belt attach lugs and need longer rivets.
* Step 5 - Figure 2 shows AD470AD4-4 rivets along the outboard foot well rib. There are though two rivets that go through the seat belt attach lugs and they need to be longer.


[[Category:Hints]]
[[Category:Hints]]

Revision as of 04:23, 18 December 2023

Build Instruction Updates

Check for more recent updates here

Page 35-2

  • Step 1 - this step needs to be also done for the Quick Build, it says "Standard Kit" only. The holes are only drilled 1/8th and need to be match drilled to #30. Also the holes on the front that need to be match drilled into the main spar aren't done with the Quick Build.
  • Step 5 - Figure 2 shows AD470AD4-4 rivets along the outboard foot well rib. There are though two rivets that go through the seat belt attach lugs and they need to be longer.